Skip to main content
Walterdale Bridge Opens in Edmonton

Walterdale Bridge Opens in Edmonton

Posted on 28.09.2017

On September 18, 2017, the Walterdale Bridge in Edmonton, Alberta, opened to traffic, replacing the previous 100-year old Walterdale Bridge built in 1912-1913. Allnorth was contracted by Acciona Pacer Joint Venture as the Erection Engineer of Record for the installation of the new bridge. Our scope included the design and approval of all erection procedures and methods used throughout the construction of the bridge, including installation of the arch, roadway deck and pedestrian walkway.

The new signature bridge will be an icon in the Edmonton skyline, serving the transportation needs of today and the future.

Read our whitepaper to discover the erection engineering solutions we provided on this challenging construction project, and click on the links to watch videos of the bridge construction:

Walterdale Bridge Arch Erection Simulation

Hanging Iron, Walterdale Iron Workers

Project Profile

 

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.

Learn More