Skip to main content

In 2015 Allnorth was retained by Clearwater Paper Corporation to provide design and engineering services for their pulping optimization project.

Allnorth’s scope of work involved all the civil, structural, mechanical, electrical and controls design for the installation of third party equipment/technology. This included the chip conveyors, the cooking system, diffusion washer, blow tank, polysulphide liquor preparation, high density pulp storage, bleach plant upgrade, and the balance of plant changes associated with the cooking system, plus the necessary building alterations.

During 2014, Allnorth had developed a solution with the client, using comprehensive energy efficiency studies that leveraged Allnorth’s extensive knowledge of the pulp-making process and advanced process simulation capabilities. This approach enabled accurate predictions of outcomes for a number of alternative implementation methodologies, and determined the solution that would deliver the highest rate of financial return and environmental sustainability.

As the world’s first purpose-built polysulfide pulp digester, this transformative project sets new industry benchmarks for pulp yield, energy conservation and reduced emissions.

RESPONSIBILITIES

  • Project management
  • Process engineering
  • Civil / structural engineering
  • Mechanical / piping engineering
  • Electrical engineering
  • Instrumentation engineering

LOCATION

Pacific Northwest US

Connect With Our Team

With locations across Canada and the United States, Allnorth works closely with clients to deliver practical solutions tailored to their unique goals and challenges. Our local teams are backed by specialists from across the company, giving you access to the right expertise when and where it's needed most.

Start a conversation with our team and discover what's possible.

Contact Us