In 2008, Taseko Mines Limited engaged Allnorth as part of a team to undertake a feasibility study on the Prosperity Mine. Allnorth worked with the Taseko team to prepare a NI 43-101 compliant technical report for the 70,000 tons per day copper-gold mine near Williams Lake, BC.

Allnorth’s responsibilities included the design of the process plant, camp facilities, and crushing, stockpiling and conveying systems. As part of the design effort Allnorth also designed a nine-bay truck shop with light vehicle shop, heated and cold storage warehouse and a separate wash bay.

Allnorth also prepared capital cost estimates for all areas of responsibility and wrote the report narratives for the appropriate report sections in the technical report.

In 2010, Taseko Mines once again engaged Allnorth to be part of a team to prepare a gap analysis report, updating the CAPEX (capital cost estimate) and designs to incorporate any changes that had occurred  since the last report.

Responsibilities

  • Mechanical, structural, civil design
  • Report preparation
  • Capital cost estimating
  • Procurement

Location

Williams Lake, BC

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.