Skip to main content

Allnorth was retained by Astaldi Canada to assist their project team on the Muskrat Falls Hydroelectric project in Goose Bay with engineering, environmental, surveying, safety, quality and contract related activities through the start-up of the construction of intake, powerhouse, spillway and transition dams and camp facilities.

The scope of work included topographical surveys, 3D scanning of the spillway, conceptual 3D modelling of access to temporary structures and crane paths, foundation design for temporary spillway structures, conceptual design for a temporary bridge and access roads to temporary structures, electrical design for temporary structures, design review of temporary Integrated Cover System, preliminary drainage design and settling ponds, development of a project specific environmental protection plan,  permitting, batch plant water supply design, temporary camp facility design and various other components related to the start-up of this project

 

RESPONSIBILITIES:

  • Engineering
  • Environmental
  • Surveying
  • 3D modelling
  • Conceptual design
  • Safety coordination
  • Contract administration

LOCATION:

Muskrat Falls, Goosebay, Labrador, NL

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.

Learn More