Skip to main content

Replacement of the Cameron Street bridge in Prince George, BC, involved demolition of the existing timber Howe truss bridge superstructure, reconstruction of the existing pier caps, construction of new abutments and installation of a new 4 span, 187 m long, steel girder, two lane bridge.

IDL Projects Inc. (IDL) engaged Allnorth to provide construction engineering services for the project. These services included conceptual and detailed designs, liaison with the bridge designers, plus construction inspections and supervision. An innovative approach was developed for the demolition and launch procedure by utilizing the existing timber bridge to launch the new superstructure. During the launch, each span of the existing truss was “picked-up” and dismantled piece by piece to meet the contract salvage requirements.

Connect With Our Team

With locations across Canada and the United States, Allnorth works closely with clients to deliver practical solutions tailored to their unique goals and challenges. Our local teams are backed by specialists from across the company, giving you access to the right expertise when and where it's needed most.

Start a conversation with our team and discover what's possible.

Contact Us