ERCO Worldwide (ERCO) retained Allnorth to create and implement an Asset Management Program (AMP) for the structural assets at their Saskatoon Chemical Plant.
The AMP was conducted in two phases:
- Phase 1 consisted of collecting asset information and drawings, developing site plans to identify asset locations, preparing the cube identification for each structural asset, and creating asset management documentation.
- Phase 2 included 3D scanning, point cloud data processing, visual structural inspections, reporting, and asset condition ratings with remedial actions to prioritize maintenance and repairs.
The goal of the AMP program was to identify capital maintenance projects, schedule re-occurring inspections, and prioritize the maintenance projects.
Allnorth will continue to support ERCO with future inspections, maintenance and design works for structural assets in order to update the AMP for the entire plant.
RESPONSIBILITIES
- Structural engineering
- 3D scanning
- Project management
- Surveying
LOCATION
Saskatoon, SK