Surespan Construction Ltd. was awarded the contract for the construction of the Simon Fraser Bridge, a 400 meter long two-lane highway bridge over the Fraser River.
Allnorth was contracted to provide the construction engineering related to the work bridge, cofferdams, and retaining walls, quality management, traffic management and site surveying. Responsibilities included construction engineering, quality management, traffic management, and site surveying.
RESPONSIBILITIES
- Construction engineering
- Quality management
- Traffic management
- Site surveying
LOCATION
Prince George, BC