There were multiple issues with the sewer system throughout the 56 unit townhouse complex at Rundlemere Road NE Calgary. These issues included constant blockages in the main and secondary lines, with multiple grade disturbances in several locations in the secondary lines.
Allnorth’s scope of work included investigating the conditions of the lines via CCTV inspection and detailing excavation and replacement of all affected lines, including all reconnection details. Also included were any branch disconnects to the individual units, base preparation, trench details, material specifications, compaction requirements, slope, grade and backfilling details. A detailed tender package was prepared, listing the replacement and rehabilitation specifications of the existing sewer lines, including pipe replacement and sewer mainlining. Allnorth also provided construction supervision services.
RESPONSIBILITIES
- Civil engineering
- Surveying
- Project management
- Preliminary and detailed design
- Tender documentation
- Construction administration
LOCATION
Calgary, AB