Allnorth has expanded its ICE service offerings with the acquisition of Dynamysk Automation Ltd. in 2024. The following is a demonstration of the bench strength added to our team.
Overview
The client operates multiple processing and manufacturing plants in Central Alberta. Raw input product pipelines feed the production facilities while bulk finished products leave the manufacturing site via rail car and truck.
To grow, maintain and continue improving their facilities, the client requires cost-effective external engineering project design and support services to support internal technical and management resources.
Our Role
With a process control automation focus and complete system lifecycle project and support services capabilities, we were selected as a vendor of choice and have been delivering engineering design, implementation, construction, commissioning, and turnaround services to support the customer’s assets for more than 10 years.
Our services have touched all areas of the client’s vertically integrated assets from central utilities through processing, manufacturing, and finished product transfer and transportation facilities. Responsibilities have included detailed instrumentation, electrical, control and functional safety system engineering, including design and project management for technology-specific and multi-discipline projects. Our knowledge of the site, and access to internal engineering processes and tools, allow our team members to work independently and act as an efficient and flexible extension of the client’s internal resource team.
In addition, our Field Services teams have been delivering IE&C construction, commissioning, turnaround and maintenance support services across all utility, processing, and manufacturing facilities.
Engineering Project Success Criteria
Human Resources
Allows client to focus on higher level concerns while we managing design, implementation, and support details.
Project Execution
Allows for more efficient project delivery, exceeding internal capacity.
Cost Savings
Continuous improvement strategies implemented to drive down unit costs.
Service and Support
Dedicated resources allocated to the program and a significant number of flexible resources with high level of client knowledge available for responsive service.
Engineering Project Statistics
Program Duration: 10+ years
Projects Executed: >500
Maximum Staffing Level: 20 engineering team members
Hardware Vendors: Honeywell, Rockwell Automation, Schneider
Process Safety: LOPA, CFSE Training, Area Classification
Control: PLC, DCS, SIS, Communications
Electrical: MCC, UPS, VFD, Cabinets
Drawings / Datasheets: AutoCAD, Microstation, SPI (Intools)