Allnorth provided project and construction management services for the construction of a new black liquor concentrator plant, a new electrostatic precipitator, and modifications to the recovery boiler, required to increase firing liquor throughput and steaming rate.
The project was successfully completed by working closely with the client in understanding their specific design requirements and integrating the new concentrator plant and precipitator in an operating mill environment, with minimal interruptions to mill production. The boiler retro-fit was completed during a mill-wide shut down and was successfully started with target operating rates reached within one week after start-up.
RESPONSIBILITIES
- Project management
- Construction management
- Quality control
- Construction engineering
- Surveying
- Purchasing
- Safety
LOCATION
Prince George, BC