Skip to main content

Allnorth was engaged by EPCOR Water Services Inc. (EPCOR) for structural assessments of 304 hatches at the Rossdale Water Treatment Plant (ROS) and 60 hatches at various reservoirs (RES) across Edmonton.

Allnorth was responsible for field evaluation of these hatches and their support to assess structural integrity. Following the field verification, Allnorth prepared an assessment report in conformance with EPCOR’s assessment template.

The final assessment report included detailed information on the internal and external state of the hatches, the estimated installation date and expected life span, with an estimate of the remaining life. The report provided an estimate of repair costs and recommendations for capital upgrades or rehabilitation for consideration.

RESPONSIBILITIES

  • Safe Work Plan
  • Field and Engineering Assessments
  • Condition Evaluation
  • Opinion of Probable Cost
  • Estimates for Upgrades
  • Report Preparation

LOCATION

Edmonton, AB

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.

Learn More