Skip to main content

The Hansard Bridge crosses the Fraser River about 100 kilometres northeast of Prince George, BC.

In 2003, the  Ministry of Transportation and Infrastructure awarded Allnorth the design component of this project to Allnorth, primarily based on our ability to provide a fast-tracked design process.

Allnorth was responsible for all aspects of design including the site survey, hydraulic analysis, geotechnical investigation, structural design and specification provisions.

The 404 metre long continuous multi-span composite bridge over the Fraser River was constructed without issue.

RESPONSIBILITIES

  • Site survey
  • Hydraulic analysis
  • Geotechnical investigation
  • Structural design
  • Special provisions

LOCATION

Prince George, BC

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.

Learn More