The proposed Kitimat Liquefied Natural Gas (LNG) facility will include natural gas liquefaction, LNG storage and marine on-loading facilities. Natural gas is planned to be delivered via a pipeline approximately 14 kilometres lateral to the Pacific Trail Pipelines.

Allnorth provided engineering and field services for this design-build project, and constructed a temporary barge loading facility for the LNG terminal, in order to facilitate the disposal of excavated material during site preparation activities. Allnorth’s scope of work included:

  • Design of a marine work trestle and dump scow loading facility; the work trestle was approximately 600 ft long, accommodating a belt conveyor and two-way dump truck traffic;
  • Design of a dump/crusher pocket retaining wall and foundations;
  • Lighting design for a dump/crusher pocket, trestle and scow loading facility;
  • Site drainage plan for trestle and dump/crusher pocket;
  • QA manual and checklists for the above work;
  • Environmental monitoring during construction.

RESPONSIBILITIES

  • Structural engineering
  • Marine engineering
  • Electrical engineering
  • Mechanical engineering
  • Environmental monitoring

LOCATION

Kitimat, BC

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.