Skip to main content

The Clowhom Hydro Facility consists of two run-of-river hydro electric generating units, Upper Clowhom and Lower Clowhom. The Clowhom Hydro Facility is located on the Clowhom River, in the South Coast Mountains, approximately 60 kilometres northwest of Vancouver.

F&M Installations Ltd. (FMI) engaged Allnorth to provide structural and electrical & control system engineering and design required for the three new draft tube maintenance gate (DTMG) hoists to replace the existing DTMG hoist and monorail system at the Clowhom Generating Station (CGS).

The objective of the replacement project was to remove the hazards associated with lifting and dogging the gates, working over water, and working at heights. 

The design included a new platform structure that housed and supported the new DTMG hoists. 3D Scanning and modeling was used to accurately design and locate the structure as well as routing electrical cables and placement of control panels, junction boxes and lighting.

Allnorth’s electrical & instrumentation scope of work included facility drawing reviews and vendor equipment document reviews to facilitate design of the gate control systems and integration with existing electrical infrastructure.

RESPONSIBILITIES

  • Structural engineering
  • Electrical and control system engineering
  • 3D scanning and modeling
  • Design reviews
  • IFC drawings
  • Final inspection and site report

LOCATION

Northeast of Sechelt, BC

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.

Learn More