The Seabee Gold Operation is located near Laonil Lake, Saskatchewan, Canada approximately 125 kilometers northeast of the town of La Ronge.
Sedgman Canada Limited, (Sedgman), contracted Allnorth to perform a design review for an independent processing structure required for a gold circuit upgrade at the Seabee mine. The additional processing structure houses one gravity oversize protection screen, two Knelson concentrators, one Acacia intensive leach reactor and one electro wining cell.
Allnorth’s scope of work included the design review and approval of electrical drawings, associated electrical packages, structural drawings, and structural design packages. All design work was carried out by Sedgman’s in house design team.
Allnorth performed the role of structural and electrical Engineer of Record, responsible for signing and sealing the drawings and package documents when they were approved to be issued for construction.
RESPONSIBILITIES
- Engineer of Record for structural and electrical engineering
- Review and approval of electrical drawings and electrical packages
- Review and approval of structural drawings and structural packages
LOCATION
125 km NE of La Ronge, SK