Skip to main content

The Seabee Gold Operation is located near Laonil Lake, Saskatchewan, Canada approximately 125 kilometers northeast of the town of La Ronge.

Sedgman Canada Limited, (Sedgman), contracted Allnorth to perform a design review for an independent processing structure required for a gold circuit upgrade at the Seabee mine. The additional processing structure houses one gravity oversize protection screen, two Knelson concentrators, one Acacia intensive leach reactor and one electro wining cell.

Allnorth’s scope of work included the design review and approval of electrical drawings, associated electrical packages, structural drawings, and structural design packages.  All design work was carried out by Sedgman’s in house design team.

Allnorth performed the role of structural and electrical Engineer of  Record, responsible for signing and sealing the drawings and package documents when they were approved to be issued for construction.

RESPONSIBILITIES

  • Engineer of Record for structural and electrical engineering
  • Review and approval of electrical drawings and electrical packages
  • Review and approval of structural drawings and structural packages

LOCATION

125 km NE of La Ronge, SK

Connect With Our Team

With locations across Canada and the United States, Allnorth works closely with clients to deliver practical solutions tailored to their unique goals and challenges. Our local teams are backed by specialists from across the company, giving you access to the right expertise when and where it's needed most.

Start a conversation with our team and discover what's possible.

Contact Us