This pedestrian bridge was fabricated out of galvanized steel using 1 1/8” diameter main cables.

The far side of the bridge was inaccessible, so an initial skyline was rigged to move drilling equipment and anchor rods. A helicopter was used to install the two towers on the far side, then the first bridge cable was pulled across on the skyline.

A catwalk was constructed over the river to complete construction on the far side. Following the installation of the first cable, the remaining cables were pulled across using the first cable. The bridge took approximately ten days to erect.

RESPONSIBILITIES

  • Structural design and engineering
  • Site surveying
  • Construction supervision

LOCATION

Yukon Territory

 

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.

Learn More