Skip to main content

Allnorth was hired by Aecon Infrastructure Management Inc. (AIMI) to provide survey monitoring and layout services for the Canadian National (CN) Railway Bridge Rehabilitation Project located near Borden, Saskatchewan.

Allnorth’s scope of work included pre-construction survey, continuous/daily displacement, slope, and vibration monitoring during piling. Piles were placed through the existing structure while maintaining continuous rail traffic on the bridge. Allnorth used 3D Scanners and Robotic Total Stations to ensure mm accuracy and that the piles avoided the existing structure.

RESPONSIBILITIES

  • Pre-construction survey
  • Visual inspection during construction
  • Displacement monitoring
  • Slope monitoring
  • Vibration monitoring
  • Pile and pile cap layout
  • 3D scanning
  • Pile conflict reports

LOCATION

    Near Borden, SK

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.

Learn More