Skip to main content

Canfor requested Allnorth to complete the engineering and design for their Polar Infeed Log Yard Improvement project. The goal of this project was to improve the ground in the infeed area in order to increase production and reduce maintenance on heavy equipment at the Polar Mill.

Allnorth completed a site inspection and survey to support the design and worked with Canfor to determine the best option for the infeed area. Allnorth was also responsible for the procurement and development of the bid package to local contractors. Allnorth assessed each bid and recommended the best option to Canfor. With Canfor’s direction, the construction services were awarded to CIF Construction (CIF).

Allnorth coordinated with CIF to support construction management and quality control throughout the project to ensure the engineered drawings were constructed as proposed. Allnorth also provided laboratory testing services, on-site concrete testing, and survey services throughout the project.

RESPONSIBILITIES

  • Civil/structural engineering
  • Materials testing
  • Survey
  • Project management
  • Construction management

LOCATION

Bear Lake, BC

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.

Learn More