Skip to main content

The disposal water line at Cenovus Foster Creek (F.C.) had several corrosion issues, and a full replacement was required. Allnorth designed a fully twinned disposal water line with short tie-in spools, allowing the bulk of the piping install to happen with the plant running, and only a short shutdown required for the final tie-ins.

Allnorth utilized 3D scanning technology to capture as-built conditions of the plant along the proposed 300m pipe route. The design teams used the 3D scan data throughout the project for structural and mechanical design efforts, ensuring zero clashes and perfect fitment.

Find an office near you

With locations across Canada and into the US and Mexico, Allnorth prides itself on being responsive to client needs and to providing leading-edge methodologies, technologies and protocols. Having a local presence helps us build strong relationships, and working cross functionally throughout the company helps us leverage the strengths of our entire team to deliver successful client solutions. Contact us today for more information as to how we can work together for you.

Learn More