Akie Mainline Extension

Allnorth Consultants Limited was contracted by Canada Zinc Metals Corp. to provide all season road access to their mineral exploration property. The project involved the planning, field layout, survey, design and construction supervision of 9 km’s of mainline road and 3.5 km’s of wilderness standard road. Allnorth was also responsible for ensuring all required permits were approved prior to construction as well as tendering the construction contract.

Client: Canada Zinc Metals Corp.

Responsiblities:

  • Road Layout
  • Detailed Road Design
  • Detailed Bridge Design
  • Tendering
  • Project Permitting
  • Construction Supervision
  • Construction Management

Project Location: Williston Lake, BC

Project Delivery: October 2008

Project Costs: $2,400,000 (construction cost)