The 182.880-m long four span continuous single lane bridge spans over the Wapiti River. Previously Canadian Forest Products would install a temporary structure to be used under frozen conditions. Installation of the permanent bridge structure eliminated the annual installation and removal of timber piles in-stream, and the possible risks associated with partial removal of timber piles.
Client: Canadian Forest Products
Responsiblities:
Project Location: Grande Prairie, AB
Project Delivery: September 2006
Project Costs: $3,000,000