Tatin Creek Bridge

This project involved the replacement of a highway culvert with a new bridge. The bridge was designed to be an 18.65m, pre-cast/pre-stressed box girder bridge on pre-cast concrete caps on steel piles. Allnorth was awarded the project that required the preliminary and detailed design of the approach roadways as well as the structure. Allnorth was also responsible for the special provisions, construction estimate, potential construction procedure, traffic management plan, environmental management plan, culvert deactivation plan and environmental permitting.

Client: Ministry of Transportation and Infrastructure - Prince George

Responsibilities:

  • Site visit
  • Preliminary design (structure)
  • Traffic management plan
  • Environmental management plan
  • Environmental permitting
  • Potential construction procedure
  • Detailed design (roads & structure)
  • Special provisions
  • Construction estimate

Project Location: Near Fraser Lake, BC (Prince George, BC)

Project Delivery: August, 2009

Project Cost: Project currently in tender phase