This was a design/build project for a bridge replacement including approaches. Our scope included Preliminary Engineering for tender, Structural Engineering, Civil Engineering, Materials Testing, Geotechnical Engineering, Environmental, Survey, Construction Engineering and Quality Management. This project had issues during the erection of the structure which are well documented. Allnorth did not deviate from our responsibility to the project team, we completed all required engineering to bring the project back on schedule. At the end of the project the MoT were satisfied with the product and commended our team on our performance on the project.
Client: Spring Point Management
Responsibilities:
Project Location: Pemberton, BC
Project Delivery: January 2005
Project Costs: $6,500,000