The BC Ministry of Transportation awarded the design component to Allnorth on the 30th of September, 2003, primarily based on our ability to provide a fast-tracked design process. The 404-m long continuous multi-span composite bridge over the Fraser River was constructed without issue. We were responsible for all aspects of design, including the SiteSurvey, Hydraulic Analysis, Geotechnical Investigation, Structural Design, and Special Provisions.
Client: BC Ministry of Transportation
Responsibilities:
Project Location: Prince George, BC
Project Delivery: January 2004
Project Costs: $7,600,000