Electrostatic Precipitators - Demineralizer Plant

Catalyst Paper Port Alberni Division retained the services of Allnorth Consultants Ltd. to design and install a new demineralizer plant to replace the 50-year-old plant. New piles and foundations were installed to support the new building and electrical centre. New multimedia filters, booster pumps and chemical skids were purchased. The existing Organic Traps and Mixed Bed Demineralizers were relocated and upgraded for their new service. During the relocation and upgrade of the existing equipment, the steam plant operated on treated water produced by portable demineralizer trailers.

Client: Catalyst Paper Port Alberni Mill

Responsibilities:

  • Preliminary Engineering Study
  • Process Engineering
  • Capital Cost Estimate
  • Structural Engineering
  • Mechanical Engineering
  • Piping Design
  • HVAC Engineering

Project Location: Port Alberni, BC

Project Delivery: October 2005

Project Cost: $5.5 million

Javascript is required to view this map.