Sludge Press - Canfor Nothwood

Canfor (Northwood) required an improved sludge dewatering system to decrease the amount of sludge carried over to the ASB's (aerated stabilization basins) and to reduce operating and maintenance costs. The project involved installing a new Andritz gravity table and screw press, including a new sludge dewatering building, auxiliary equipment, process and service piping and all E&I and DCS/PLC equipment. In addition to design engineering the mill required assistance with project management, equipment procurement and generation of contractor bid packages.

Client: Canadian Forest Products Ltd. (Northwood)

Responsibilities:

  • Design Engineering
  • Project Management
  • Equipment Procurement
  • Creation of Bid Packages

Project Location: Prince George, BC

Project Delivery: Fall 2003

Project Costs: $2,920,000