Willow Flats Rail Siding

Allnorth surveyed several possible locations for a rail load-out at the Willow Creek Mine near Chetwynd, BC, and provided layout for each proposed location. Allnorth also prepared earthworks volumes and coordination of coal storage area equipment.

Client: Western Canadian Coal

Responsibilities:

  • Survey
  • Design
  • Drafting

Project Location: Chetwynd, BC

Project Delivery: Spring 2005

Project Cost: Withheld at Client's Request

Javascript is required to view this map.