Afton Mine – Access Road

The access road to the pit at the Afton Mine near Kamloops BC was determined to be
inadequate to accommodate planned expansion of the mine due to stability issues. Allnorth
was retained to evaluate LiDAR and field geotechnical information to determine an optimal
route solution, and provide detailed design of the access route and runaway lanes to
provincial mining code specifications.

Client: Ledcor CMI

Responsibilities:

  • Detailed Design
  • Slope Staking
  • As-Builts

Project Location: Kamloops, BC

Project Delivery: March 2007

Project Cost: Withheld at client’s request